Gantner (R.reader) Onboarding

Updated over 4 months ago

Adding PV Gantner (Q.reader) Connections, Sites and Assets to Farsight.

Integrating new Photo Voltaic ( Solar) assets into Farsight is a straightforward process, provided you have the necessary information and files ready. Farsight’s goal is to reduce the onboarding time from weeks and months to under 15 minutes, allowing for a seamless and efficient setup.

Requirements

  • Farsight® Admin account

  • FTP credentials file or FTP credentials

Note: FTP credentials consist of the server address (or hostname), the username, the password, and the port number.

Adding a connection, sites and assets in Farsight

Once you have the requirements above, you will need to use the onboarding wizard to add a connection and then add your sites and assets.

Go to: Asset Manager > Asset Manager > Add Connection

  1. Select Solar

  2. Click on the Next button

Log in and Connect

  1. Select the data source Gantner (Q.reader)

  2. Upload your FTP credentials JSON file. This should contain your access credentials

  3. Test your connection by clicking on the Test Connection button. This is mandatory to be able to proceed to the next step. If successful, then you can proceed to the next step and add a power plant. If the test fails, recheck your inputs and then contact us

  4. Once your connection is secured, click on Next

Alternatively, you can enter your credentials manually. Click on Skip upload and enter credentials manually.

  1. Add your FTP Host

  2. Add you username

  3. Add your password

  4. Test your connection by clicking on the Test Connection button

  5. Once your connection is secured, click on Next

Note: Entering your credentials manually is a method prone to mistakes. Make sure you copy your credentials correctly.

Add Power Plant

  1. Input the name of the power plant

  2. Add your FTP Path for connection

  3. You can import historical data. If you do, you will be able to use the Autodiscover feature to discover all assets that belong to the specific site and identify their models automatically

  4. These check fields are optional. They let you provide additional configuration, for the device, for the upload intervals and your folder structure for the downloads

  5. Once finished, click Next to proceed to the final step

Optional Check Fields

Fields

Description

Include device configuration

When checked the system is expected to find metadata regarding the powerplant configuration and its devices in the ftp folder, if not the system will try to reconstruct the site configuration looking at the data

Include Device Intervals

When checked the system is expected to find metadata regarding the device's logging interval specifying how data is measured, aggregated, and saved in the ftp folder, if not, the system will try to reconstruct the needed information looking at the date

Upload in Subfolders

If checked the system expects to find data organized in subfolders based on the devices hierarchy, if not the system will assume that all the devices data are placed on the root (the FTP path)

Confirmation

  1. The final step is to review all the added details. Once you are satisfied, simply click on the Save and Proceed button and the onboarding is done.